WELCOME TO
red bricks academy of civil engineering

Building Estimation Course

Kindly follow the step by step process and learn How to make detail estimate of Building 

BEST OF LUCK

Section 1

Construction of Sub Structure

Topic 1

1. How To Find Quantity Of Excavation Of Footings

In this lecture, you are going to learn how to calculate the quantity of excavation of footings from drawing. on-site you have to prepare the Bill of the quantity of excavation of footings for the client as well as for the subcontractor. The excavation quantity sheet is prepared in MS- Excel by taking off the quantities from the AutoCAD drawing.

Topic 2

2. Quantity Of Excavations Of Brick Wall Foundations

In this lecture, you are going to learn how to calculate the quantity of excavation of footings from drawing. on-site you have to prepare the Bill of the quantity of excavation of footings for the client as well as for the subcontractor. The excavation quantity sheet is prepared in MS- Excel by taking off the quantities from the AutoCAD drawing.

Topic 3

3. Calculation Of Quantity Of Pcc In Footings

In this lecture, you are going to learn how to calculate the quantity of Plain Cement Concrete below the footings. the concrete of footing should not make direct contact with soil that is why a layer of P.C.C. is done between the footing and the ground. the quantities are calculated in MS-Excel directly with the help of Autocad Quantities are prepared in MS-Excel with the help of Autocad.

Topic 4

4. Calculate Quantity Of P.C.C. Below Brick Wall Of Foundations

In this Lecture, you are going to learn how to calculate the quantity of P.C.C. below the brick wall foundation. The plain cement concrete (P.C.C.) is also done below the foundation walls so that a hard and flat base is made below the brickwork foundation wall. the quantities are calculated in MS-Excel directly through Autocad

Topic 5

5. How To Calculate Quantity Of Concrete In Isolated Footing

In this Lecture, you are going to learn how to calculate the quantity of concrete on the isolated footing. The isolated footings are also known as tapered footings. The quantity of concrete in isolated footing is solved in two parts first is the base part and the second is the tapered portion. The quantity of concrete of all the footings in the drawing is calculated in the MS Excel sheet by taking off the quantities directly through AutoCAD.

Topic 6

6. Calculate Quantity Of Concrete In Column Below Plinth Level

In this lecture, you will learn how to calculate the quantity of concrete in columns below the plinth beam. The casting of concrete is done in parts are the first part is below the plinth level and the bill is prepared which comes under the sub-structure part and then we will cast the concrete above the plinth level. the total quantity of concrete is calculated in MS-Excel using AutoCAD.

Topic 7

7. Quantity Of Concrete In Plinth Beam

In this lecture, you will learn how to calculate the quantity of concrete in the plinth beam according to the drawing. The plinth beam is the beam that lies on the ground level. All the quantities of concrete are calculated directly in MS-excel using AutoCAD.

Section 2

Construction Above Plinth Level(Super- Structure)

Topic 1

1. Calculation Of Quantity Of Concrete In Column Above Plinth Level

In this lecture, you will learn how to calculate the quantity of concrete in columns above the plinth beam. The casting of concrete is done in parts are the first part is below the plinth level and the bill is prepared which comes under the sub-structure part and then we will cast the concrete above the plinth level which comes under the superstructure part. the total quantity of concrete is calculated in MS-Excel using AutoCAD.

Topic 2

2. Calculate Quantity Of Concrete In Lintel Beam

In this lecture, you will learn how to calculate the quantity of concrete in the lintel beam. The lintel beams are the beam that is provided above the door and window frames so that the wooden frames should not bear any type of load.

Topic 3

3. Calculate Quantity Of Concrete In Roof Beams

In this lecture, you will learn how to calculate the quantity of concrete in the roof beam. The roof beam is the beam that is cast below the slab and the reinforcement bars of the beam are interconnected with the slab reinforcement. The quantity of concrete of all the roof beams is calculated directly in MS-Excel using AutoCAD.

Topic 4

4. Calculate Quantity Of Concrete In Roof Slab

In this lecture, you will learn how to calculate the quantity of concrete in the roof slab. The casting of the roof beam and roof slab is done together on the same day as the casting of concrete. The quantity of concrete whole slab is calculated directly in MS-Excel using AutoCAD.

Section 3

Brickwork Construction Work

Topic 1

1. Introduction To Brickwork

In this lecture, you will learn to calculate the number of bricks in 1 cubic meter of brickwork. We have to find the number of bricks according to the Indian standard size of a brick. the size of brick is different on site so we have to find out the number of bricks according to the size of brick used on site.

Topic 2

2. How To Calculate Number Of Bricks In Foundation (Sub Structure) Of Building

In this lecture, you will learn how to find out the number of bricks in the foundation wall of the building. The foundation wall is constructed from column to column below the plinth level. So we have to find out the number of bricks used according to the drawing. And these quantities are calculated directly in MS-Excel. By taking off quantities from AutoCAD.

Topic 3

3. Calculate The Quantity Of Bricks Above Plinth Level (Super Structure)

In this lecture, you will learn how to find out the number of bricks above the plinth level(super-structure). The brick wall is constructed from column to column above the plinth level. So we have to find out the number of bricks used according to the drawing. And these quantities are calculated directly in MS-Excel. By taking off quantities from AutoCAD.

Section 4

Staircase Construction

Topic 1

1. Calculation Of Quantity Of Concrete In Staircase

In this lecture, you will learn how to calculate the quantity of concrete in the staircase. This is the type of dog-legged staircase, which consists of two landings one waist slabs, and the steps of stairs.

Section 5

Shuttering Area of all RCC Members

Topic 1

1. Shuttering Area Of An Isolated Footing

In this lecture, you will learn how to calculate the shuttering area of isolated footings. The shuttering area is calculated so as to make the bill of sub-contractor and also for client bills. The bill is explained in MS-Excel and it is prepared according to AutoCAD drawing.

Topic 2

2. Shuttering Area Of Column Below Plinth Beam

In this lecture, you will learn how to calculate the shuttering area of columns. The height of the column is taken below the plinth beam. Because the shuttering work is calculated in two parts- below plinth beam and above plinth beam. The shuttering area is calculated so as to make the bill of the sub-contractor and also for the client bill. The bill is explained in MS-Excel and it is prepared according to AutoCAD drawing.

Topic 3

3. Shuttering Area Of Plinth Beam

In this lecture, you will learn how to calculate the shuttering area of the plinth beam. The shuttering plates are used on two faces of beam inner and outer face. The shuttering area is calculated so as to make the bill of the sub-contractor and also for the client bill. The bill is explained in MS-Excel and it is prepared according to AutoCAD drawing.

Topic 4

4. Shuttering Area Of Column Above Plinth Beam

In this lecture, you will learn how to calculate the shuttering area of columns. The height of the column is taken above the plinth beam. Because the shuttering work is calculated in two parts- below plinth beam and above plinth beam. The shuttering area is calculated so as to make the bill of sub-contractor also for the client bill. The bill is explained in MS-Excel and it is prepared according to AutoCAD drawing.

Topic 5

5. Shuttering Area Of Roof Beam

In this lecture, you will learn how to calculate the shuttering area of the roof beam. The shuttering plates are used on two faces of the beam’s inner and outer face and also on the bottom surface. The shuttering area is calculated so as to make the bill of the sub-contractor and also for the client bill. The bill is explained in MS-Excel and it is prepared according to AutoCAD drawing.

Topic 6

6. Shuttering Area Of Slab

In this lecture, you will learn how to calculate the shuttering area of the roof slab. The shuttering area is calculated so as to make the bill of the sub-contractor and also the bill is prepared for the client. The calculation of the shuttering area of the slab is explained in MS-Excel and it is prepared according to AutoCAD drawing.

Section 6

Quantity of Cement Sand & Aggregate in Concrete

Topic 1

1. Calculation Of Cement, Sand, Aggregate In Concrete

In this video, you will learn how to calculate the quantity of cement, sand, and aggregate in concrete. usually, the concrete on-site comes from the RMC plant but sometimes we have to make the concrete on-site by knowing the proper quantity of cement sand aggregate in the concrete according to the ratio.

Section 7

Finishing Work of Building

Topic 1

1. How To Calculate Quantity Of Internal Plaster Of Wall

In this video, you will learn how to calculate the quantity of inner plaster of the building. we have to make a proper bill for the client as well as for the contractor. the minimum thickness used in the internal plaster is 10mm. the quantity of plaster is calculated according to drawing and the sheet is prepared in MS- Excel.

Topic 2

2. How To Calculate Quantity Of External Plaster Of Wall

In this video, you will learn how to calculate the quantity of external plaster of the building. we have to make a proper bill for the client as well as for the contractor. the minimum thickness used in the external plaster is 12mm. the quantity of plaster is calculated according to drawing and the sheet is prepared in MS- Excel.

Topic 3

3. Quantity Calculation Of Marble Work

In this video, you will learn about marble work that is how to find the quantity of marble while doing marble work of building. the marble work is measured in square meters and square feet. quantity of marble work is explained in detail with AutoCAD and in MS-Excel.

Topic 4

4. Quantity Calculation Of Tile Work

Tiles are also used nowadays for flooring work so in this video you will learn about tile work that is how to find the number of tiles while doing tile work of building. the tiles are in numbers. The quantity of tile work is explained in detail with AutoCAD and MS-Excel.

Section 8

Bar Bending Schedule

Topic 1

1. Introduction To Bar Bending Schedule

In this lecture, you will learn about the bar bending schedule i.e, what is the bar bending schedule, and what is used on the construction site.

Topic 2

2. Procedure Of Bar Bending Schedule

In this lecture, you will learn in detail how the bar bending schedule is prepared on-site. we have to measure the weight of steel for billing work.